Surface Detector Operations Readiness Review - SDEU subsystem

Sunday, 14 April 2024 from to (America/Argentina/Mendoza)
at Malargue ( RED Room )
Zoom link: TBD
Description

The Auger Project Management Plan defines the objective of the Operations Readiness Review as:

A subsystem only becomes part of the operation of the Observatory when it has passed an Operations Readiness Review. This review ensures that the subsystem is in effective, stable operation, all documentation has been filed, spares are available and the staff has been trained.

The purpose for all of the review is to determine if the SDEU subsystems is ready to be included in the operation of the observatory for science production. Additionally, the review committee should asses if all the necessary material needed for operation and maintenance are existing and available.

Detailed frame of the Review:

  • Upgraded Unified Board, both electronics and mechanics parts, including attachments. All electrical connections (power, signals, slow-control, interfaces, GPS antenna and grounding) and cable protections;
  • Small PMT and base, HV module, all electrical connections (power, signal and grounding) and cable protection. Mechanical assembly, attachment and stabilization parts;
Material:
Go to day