26-31 July 2021
Mexico City
Mexico/General timezone
HADRON 2021 is over. Thanks for making it a success!
Home > Timetable > Session details
PDF | iCal

Hadron decays, production and interactions-7

Place

Location: Mexico City
Date: 30 Jul 09:45 - 10:45

Conveners

    • Prof. Neubert, Sebastian (HISKP, Bonn University)

Timetable | Contribution List

Displaying 3 contributions out of 3
Type: Parallel Session: Hadron decays, production and interactions-7
Track: Hadron Decays, Production and Interactions
The observed matter-antimatter asymmetry in the universe composes a serious challenge to our understanding of nature. BNV/LNV decays have been searched in many experiments to understand this large-scale observed fact. But few in the case of $e^+e^-$ collision experiments are performed. Here we present some recent results to search BNV and LNV at BESIII experiment.
Presented by Huijing LI on 30/7/2021 at 9:45
Type: Parallel Session: Hadron decays, production and interactions-7
Track: Hadron Decays, Production and Interactions
The charged Lepton Flavor Violation (cLFV) is highly suppressed in the Standard Model (SM) by the finite but tiny neutrino masses. Its branching fraction is calculated to be at a negligible level and so far none has been found in all the historical experiments, including searches in lepton ($\mu$,$\tau$) decays, pseudoscalar meson (K,$\pi$) decays, vector meson ($\phi$,$J/\psi$,$\Upsilon$) decays, ... More
Presented by Mengzhen WANG on 30/7/2021 at 10:05
Type: Parallel Session: Hadron decays, production and interactions-7
Track: Hadron Decays, Production and Interactions
To better understand the low-energy QCD in the strangeness sector there is a strong need of experimental data. The measurements of kaonic atoms transitions play a very special role, since they provide the interaction between kaons and nucleon/nuclei at threshold. The missing information is the determination of the hadronic 1s level energy shift and width of kaonic deuterium. The setup, SDDs develo ... More
Presented by Dr. Florin Catalin SIRGHI on 30/7/2021 at 10:25
Building timetable...