from 28 November 2016 to 2 December 2016
Hotel Rincón del Arco
Mexico/General timezone
Contribution
Abstract content
Status of the AFP project in the ATLAS experiment is given. In 2016 one arm of the AFP detector was installed and first data have been taken. In parallel with integration of the AFP subdetector into the ATLAS TDAQ nad DCS, beam tests and preparations for the installation of the 2nd arm are performed.