Undergound Muons Detector Operations Readiness Review

Monday, 23 March 2026 from to (America/Argentina/Mendoza)
at Malargue ( TBD room )
TBD zoom link
Description

The Auger Project Management Plan defines the objective of the Operations Readiness Review as:

A subsystem only becomes part of the operation of the Observatory when it has passed an Operations Readiness Review. This review ensures that the subsystem is in effective, stable operation, all documentation has been filed, spares are available and the staff has been trained.

The purpose for all of the review is to determine if the UMD subsystems is ready to be included in the operation of the observatory for science production. Additionally, the review committee should asses if all the necessary material needed for operation and maintenance are existing and available.

Detailed frame of the Review:

  • UMD electronics boards, hardware and on-board software and firmware;
  • UMD electrical interfaces and interconnection with SD;
  • UMD communications interfaces;
  • Detector mechanics;
  • UMD Power supply;
Material:
Go to day
  • Monday, 23 March 2026
    • 11:30 - 13:00 Presentations 1h30'
    • 13:00 - 13:30 Discussions 30'