Radio Detector Operations Readiness Review

Sunday, 9 March 2025 from to (America/Argentina/Mendoza)
at Malargue ( Red Room )
Zoom: https://zoom.us/j/95066938841?pwd=9aWbn73XFTRuytr1ICdJOqH0B2a7wm.1 ID: 950 6693 8841 Access code: 476351
Description

The Auger Project Management Plan defines the objective of the Operations Readiness Review as:

A subsystem only becomes part of the operation of the Observatory when it has passed an Operations Readiness Review. This review ensures that the subsystem is in effective, stable operation, all documentation has been filed, spares are available and the staff has been trained.

The purpose for all of the review is to determine if the RD subsystems is ready to be included in the operation of the observatory for science production. Additionally, the review committee should asses if all the necessary material needed for operation and maintenance are existing and available.

Detailed frame of the Review:

  • SALLA antenna and all mechanical components and supports;
  • HF electronics of the antenna (LNA), signal digitizer and UUB electrical interface;
Participants Joerg Hoerandel
Material:
Go to day
  • Sunday, 9 March 2025
    • 11:30 - 13:00 Presentations 1h30'
      Speaker: Joerg Hoerandel (Radboud University Nijmegen)
      Material: Slides pdf file document linkdown arrow
    • 13:00 - 13:30 Discussions 30'
      Speaker: Joerg Hoerandel (Radboud University Nijmegen)